DEPARTMENT OF PLANNING AND PERMITTING
PUBLIC HEARING NOTICE
NOTICE IS HEREBY GIVEN of a public hearing to be held by the Department of Planning and Permitting of the City and County of Honolulu under Special Management Area Ordinance, Chapter 25, R.O.H., as amended, for the following application at the date and the time specified or soon thereafter:
_____________________________________________
DATE: Wednesday, November 14, 2007
TIME: 10:30 a.m.
PLACE: Waianae District Park, 85-601
Farrington Highway, Waianae
APPLICATION: SPECIAL MANAGEMENT AREA USE
PERMIT (SMP) FILE NO. 2007/
SMA-63(ST)
Applicant
Landowner: Hawaiian Electric Company, Inc.
Agent: Planning Solutions, Inc.
Location: 92-200 Farrington Highway – Kahe
Tax Map Key: 9-2-3: por. 27
Zoning: R-5 Residential District
File Number: Special Management Area Use Permit
Proposal: Kahe Power Plant Reclaimed Water
Storage Improvements: Conversion of the existing demineralized water tank
(No. 53) to a reverse osmosis tank; a new 40,000-50,000-gallon
demineralized water storage tank (No. 54); replacement of two (2) 40,000-
gallon water storage tanks (No. 13 and 32); and a new eight-inch pipeline for
reclaimed water (reverse osmosis) from the Honolulu Wastewater Treatment Plant.
_______________________________________________________________
Maps showing the general location and boundaries of the area under consideration are on file at the Department of Planning and Permitting, Permit and Zoning Records Access, First Floor, Frank F. Fasi Municipal Building, 650 South King Street, and are available to the public for inspection during office hours, 7:45 a.m. to 4:30 p.m., Monday through Friday. For assistance, please call the department\u2019s Zoning Regulations and Permits Branch at 768-8024.
Any disabled persons requiring special assistance should contact the Department of Planning and Permitting at 768-8006 for details.
All interested persons are invited to attend. Those persons desiring to testify may register prior to the public hearing at the public hearing site and are encouraged to submit one copy of their testimony in writing.
Attendance at the public hearing is not necessary to submit testimony. Written testimony which is received by the Department of Planning and Permitting at the above address prior to the public hearing will be included with the transcripts of the hearing and will be considered in the evaluation of the request.
Henry Eng, FAICP
Directort of Planning and Permitting
(SB03512718 10/24/07)